论山区高速公路运营期三坡工后评估及排查工作的必要性
DOI:
作者:
作者单位:

中国地质科学院探矿工艺研究所,中国地质科学院探矿工艺研究所,中国地质科学院探矿工艺研究所

作者简介:

通讯作者:

中图分类号:

U418

基金项目:


Necessity of Post Construction Evaluation and Investigation of the Slopes in Highway Operation Period in Mountainous Area
Author:
Affiliation:

Institute of Exploration Technology, CAGS,Institute of Exploration Technology, CAGS,Institute of Exploration Technology, CAGS

Fund Project:

  • 摘要
  • |
  • 图/表
  • |
  • 访问统计
  • |
  • 参考文献
  • |
  • 相似文献
  • |
  • 引证文献
  • |
  • 资源附件
  • |
  • 文章评论
    摘要:

    针对目前高速公路建设形成的“三坡”( 路基边坡、桥梁基坑边坡、隧道进出口仰坡)在运营期间发生的各类地质灾害现象,提出了高速公路“三坡”的工后评估与排查,为高速公路正常运营、地质灾害防治措施等方面提出建设性意见。

    Abstract:

    In view of various geological hazards occurred during the highway operation period at the subgrade slope, bridge foundation pit slope and front slopes at tunnel entrance & exit formed in the highway construction, the post construction evaluation and investigation of the above mentioned 3 slopes are put forward, and some constructive suggestions are given for highway normal service and geological hazard control measures.

    参考文献
    相似文献
    引证文献
引用本文

李勇,庄生明,黄文洁.论山区高速公路运营期三坡工后评估及排查工作的必要性[J].钻探工程,2018,45(8):112-115.
LI Yong, ZHUANG Sheng-ming, HUANG Wen-jie. Necessity of Post Construction Evaluation and Investigation of the Slopes in Highway Operation Period in Mountainous Area[J]. Drilling Engineering, 2018,45(8):112-115.

复制
分享
文章指标
  • 点击次数:
  • 下载次数:
  • HTML阅读次数:
  • 引用次数:
历史
  • 收稿日期:2018-07-26
  • 最后修改日期:2018-07-26
  • 录用日期:2018-07-30
  • 在线发布日期: 2018-09-30
  • 出版日期: