1.吉林大学建设工程学院,吉林 长春 130026; 2.自然资源部复杂条件钻采技术重点实验室,吉林 长春 130026; 3.中国地质调查局油气资源调查中心,北京 100083; 4.中国地质调查局广州海洋地质调查局,广东 广州 510075
P634
中国地质调查局项目(编号:DD20190232)
1.College of Construction Engineering, Jilin University, Changchun Jilin 130026, China; 2.Key Lab of Drilling and Exploitation Technology in Complex Conditions of Ministry of Natural Resources, Changchun Jilin 130026, China; 3.Oil and Gas Resources Investigation Center, China Geological Survey, Beijing 100083, China; 4.Guangzhou Marine Geological Survey, China Geological Survey, Guangzhou Guangdong 510075, China
康家浩,郭威,陆程,等.水合物开采过程中影响套管式加热器对井周地层加热效果的数值模拟[J].钻探工程,2019,46(6):1-7.KANG Jiahao, GUO Wei, LU Cheng, et al. Numerical simulation of heating process of casing heater in natural gas hydrate production wells[J]. Drilling Engineering, 2019,46(6):1-7.
复制