土耳其天然碱溶采钻井项目管理实践
投稿时间:2020-07-31  修订日期:2020-07-31  点此下载全文
引用本文:胡汉月,陈晓林,刘志强,等.土耳其天然碱溶采钻井项目管理实践[J].钻探工程,2020,47(8):3-6.
HU Hanyue,CHEN Xiaolin,LIU Zhiqiang,et al. Management of the drilling project for trona solution mining in Turkey[J]. Drilling Engineering, 2020,47(8):3-6.
摘要点击次数: 1139
全文下载次数: 619
作者单位E-mail
胡汉月* 中国地质科学院勘探技术研究所河北 廊坊 065000 huhanyue002@qq.com 
陈晓林 中国地质科学院勘探技术研究所河北 廊坊 065000  
刘志强 中国地质科学院勘探技术研究所河北 廊坊 065000  
刘海翔 中国地质科学院勘探技术研究所河北 廊坊 065000  
基金项目:中国地质调查局地质调查项目“土耳其卡赞贝帕扎里天然碱矿探采方法技术合作”(编号:DD2019090602)
中文摘要:土耳其天然碱溶采钻井项目包括ETI SODA开发合同一~六期和KAZAN SODA开发合同一~三期,共成功实施溶采井组200余组。海外钻井工程涉及的影响因素较多,除常规的钻井工程技术问题外,还需要适应当地的政治、法律、风俗、汇率、海运、关税等问题。项目部在实施过程中根据海外钻井工程特点以及现场施工环境,加强项目人员、设备材料、现场作业、安全及风险等方面的管理,发挥指导、管理、控制作用,降低工程风险,提高收益,确保项目顺利完工。本文就土耳其天然碱溶采对接井钻井项目人员组织管理、设备器具管理、现场作业程序管理、HSE管理及风险管理进行了介绍,总结了一些海外钻井项目管理经验。
中文关键词:天然碱矿  水溶开采  对接井  钻井项目  项目管理  土耳其
 
Management of the drilling project for trona solution mining in Turkey
Abstract:The intersected well drilling project for trona solution mining in Turkey covers Beypazari Phase I to VI drilling works and Kazan Phase I to III drilling works with a total of 200 plus solution mining well sets completed. Overseas drilling works involves with many aspects other than technical issues, among them local politics, regulations, customs, exchange risk, ocean shipment, custom duties. In light of the characteristics of overseas drilling projects and the field working conditions, the project office intensified the management of personnel, equipment and material, site operations, safety and risk, and played properly its role of direction, administration and control so as to reduce project risk, increase profit and ensure smooth completion of the project. This paper introduces the management of the intersected well drilling project for trona solution mining in Turkey in terms of personnel organization, equipment mobilization, on site operations, HSE and risk control; and summarizes some management experiences on overseas drilling projects.
keywords:trona mine  solution mining  intersected well  drilling project  project management  Turkey
查看全文  查看/发表评论  下载PDF阅读器