自201井区页岩气井水平段安全高效钻井技术
投稿时间:2021-03-18  修订日期:2022-01-04  点此下载全文
引用本文:孙凯,刘化伟,明鑫,等.自201井区页岩气井水平段安全高效钻井技术[J].钻探工程,2022,49(2):104-109.
SUN Kai,LIU Huawei,MING Xin,et al. Safe and high-efficiency drilling technology for horizontal sections of shale gas wells in Well Block Zi-201[J]. Drilling Engineering, 2022,49(2):104-109.
摘要点击次数: 683
全文下载次数: 609
作者单位邮编
孙凯 中石化中原石油工程有限公司钻井一公司河南 濮阳 457001 457001
刘化伟 中石化中原石油工程有限公司西南钻井分公司四川 成都 610000 610000
明鑫 中石化中原石油工程有限公司西南钻井分公司四川 成都 610000 610000
乐守群 中石化中原石油工程有限公司钻井一公司河南 濮阳 457001 457001
中文摘要:自201井区是中石油部署在自贡市荣县地区的重点页岩气勘探开发区域,根据该井区的钻井工程实践,水平段工程难点主要有坍塌掉块严重、井壁稳定性差、轨迹控制困难、优质储层钻遇率低、起下钻阻卡频繁等高风险井下故障,严重制约了安全高效施工。针对上述难题,研选无扶螺杆优化钻具组合,降低下部钻具组合的刚性和摩阻;同时,研制了可塑性变形粒子和刚性封堵材料的封堵剂复配配方,在提高密度的基础上,强化了油基钻井液对井壁的支撑性及封堵性,确保了水平段安全高效钻进。实现了自201井区页岩气水平井正常完钻,并且与前期完钻井相比,本轮施工节约钻井周期34.12%,优质储层钻遇率100%,为该区块安全高效作业提供了参考,为增储上产奠定了基础。
中文关键词:页岩气  水平段  安全钻井  无扶螺杆  钻具组合  封堵剂  自201井区
 
Safe and high-efficiency drilling technology for horizontal sections of shale gas wells in Well Block Zi-201
Abstract:Well Block Zi-201 is a key shale gas exploration and development area invested by PetroChina in the Rongxian area, Zigong city. Drilling of horizontal sections in this well block encountered many engineering challenges, mainly including serious borehole sloughing, hole instability, difficult well path control, low intersection rate of high-quality reservoirs, frequent sticking while tripping, which seriously restricted drilling safety and efficiency. In view of the above problems, the non-stabilizer mud moter was selected to optimize the BHA for reduction of the rigidity and friction of the BHA. At the same time, the compound plugging agent with plastic deformation particles and rigid plugging materials has been developed to improve the density, and strengthens the well wall support and sealing characteristics of the oil-based drilling fluid so as to ensure drilling safety and efficiency in the horizontal sections, and realize the normal completion of horizontal wells in Well Block Zi-201. Moreover, compared with previous drilling, the drilling period has been reduced by 34.12% with the effective intersection rate in high-quality reservoirs up to 100%, which provides a reference for safe and efficient drilling in the block and lays a foundation for increasing explored reserves and production.
keywords:shale gas  horizontal section  safe drilling  non-stabilizer mud moter  BHA  plugging agent  Well Block Zi-201