小口径绳索取心钻进在砀山地区深厚泥岩地层中的施工技术
投稿时间:2021-03-26  修订日期:2022-01-24  点此下载全文
引用本文:王盛,潘振泉,秦正运.小口径绳索取心钻进在砀山地区深厚泥岩地层中的施工技术[J].钻探工程,2022,49(2):85-90.
WANG Sheng,PAN Zhenquan,QIN Zhengyun. Small diameter wireline core drilling for deep mudstone formation in Dangshan area[J]. Drilling Engineering, 2022,49(2):85-90.
摘要点击次数: 1093
全文下载次数: 690
作者单位邮编
王盛 江西省地质矿产勘查开发局九一二大队江西 鹰潭 335000 335000
潘振泉* 江西省地质矿产勘查开发局九一二大队江西 鹰潭 335000 335000
秦正运* 鲁国化工(山东)有限公司山东 临沂 276000 276000
中文摘要:本文介绍了小口径绳索取心钻进工艺在安徽省砀山县北部地热资源调查ZK01孔中的实践经验。厚度达600多米的水敏性泥岩地层遇水后表面水化,出现缩径和套管内壁结成虚厚泥皮现象,导致泥浆循环不畅、出现憋泵持压。根据小口径绳索取心钻进工艺特点,分析了该孔缩径特征、套管内壁结泥皮原因后,采用了液控扩孔钻头和无固相乳化抑制泥浆体系等技术取得了很好的效果。文中介绍了液控扩孔钻头原理、扩孔作业注意事项、无固相乳化抑制泥浆的维护和配制。其中液控扩孔钻头是首次在小口径绳索取心钻进工艺中采用,为后续施工类似地层提供了很好的借鉴作用。
中文关键词:小口径绳索取心钻进  水敏性泥岩地层  缩径  套管内壁结泥皮  液控扩孔钻头  乳化泥浆
 
Small diameter wireline core drilling for deep mudstone formation in Dangshan area
Abstract:This article introduces field use of small-diameter wireline core drilling for geothermal survey hole ZK01 in the northern part of Dangshan County, Anhui province, where water-sensitive mudstone formation with a thickness of more than 600m was encountered. The mudstone was hydrated at the surface after encountering water, leading to the diameter shrinkage and the thick mud cake on the inner wall of the casing, which resulted in poor mud circulation and mud pump choking. In light of the characteristics of the small-diameter rope core drilling process, with analysis of the hole shrinkage characteristics and the causes for the mud cake on the inner wall of the casing, hydraulic control reaming drill bits were used with non-solid emulsified inhibitive drilling mud to achieve good results. The article describes the principle of the hydraulic control reaming bit, the precautions for reaming operation, the maintenance and preparation of non-solid emulsified inhibitive mud. The hydraulic control reaming bit was used for the first time in the small-diameter wire core drilling process, which can provide a good reference for subsequent drilling in similar formations.
keywords:small-diameter wire core drilling  water-sensitive mudstone formation  borehole shrinkage  mud cake on the inner wall of the casing  hydraulic control reaming bit  emulsified mud
查看全文  查看/发表评论  下载PDF阅读器