下扬子页岩气地质调查井的溶洞识别与处理
投稿时间:2022-03-03  修订日期:2022-07-14  点此下载全文
引用本文:赵志涛,蒋睿,卢彤,等.下扬子页岩气地质调查井的溶洞识别与处理[J].钻探工程,2022,49(5):22-29.
ZHAO Zhitao,JIANG Rui,LU Tong,et al. Karst cave identification and treatment for a Lower Yangtze shale gas geological survey well[J]. Drilling Engineering, 2022,49(5):22-29.
摘要点击次数: 808
全文下载次数: 563
作者单位E-mail
赵志涛* 北京探矿工程研究所北京 100083 zhaozt36@126.com 
蒋睿 北京探矿工程研究所北京 100083
中国地质大学(北京)北京 100083 
 
卢彤 北京探矿工程研究所北京 100083  
朱迪斯 中国地质调查局油气资源调查中心北京100083  
徐军军 北京探矿工程研究所北京 100083  
欧阳志勇 北京探矿工程研究所北京 100083  
朱文鉴* 北京探矿工程研究所北京 100083  
基金项目:中国地质调查局地质调查项目“合肥盆地及周缘油气资源战略调查(北京探矿工程研究所)”(编号:DD20201111)、“下扬子地区古生界页岩气基础地质调查(北京探矿工程研究所)”(编号:DD20179082)、“地质矿产勘查钻探技术升级与应用示范”(编号:DD20211345)
中文摘要:下扬子地区页岩气地质调查井皖南地1井在奥陶系宝塔组灰岩地层1223.54~1226.34 m井段钻遇了溶洞,根据地质、地震、钻井、录井、岩心、测井曲线等资料中的溶洞识别特征和规律,通过分析钻具放空,泥浆失返,钻时为0或极低,岩心缺失,电阻率明显降低,密度明显减小,声波、中子数值明显增大等溶洞特征,判定钻遇了半充填、沿井眼轴向长2.8 m的溶洞。基于以上判断,并结合实际工况,通过对比分析桥接堵漏、水泥堵漏、顶漏钻进与套管封隔、波纹管堵漏、凝胶堵漏和移井位等常见溶洞处理方法的特点和使用范围,优选了清水强钻至完整地层后下套管封隔的处理措施,保证了皖南地1井顺利完钻并实现钻探目的。
中文关键词:页岩气地质调查  页岩气井  溶洞识别  顶漏钻进  套管封隔  皖南地1井  下扬子地区
 
Karst cave identification and treatment for a Lower Yangtze shale gas geological survey well
Abstract:Well WND1, a Lower Yangtze shale gas geological survey well, was drilled into a karst cave in Ordovician Baota Formation limestone strata . It can be diagnosed that a semi-filled cave with axial length of 2.8m along the borehole has been encountered by analyzing the cave identification features and law, such as drilling string fall-down, lost return of mud, drilling-time as low as 0 or extremely low, core missing, significant decrease in resistivity, obvious decrease in density, increase in acoustic and neutron values. Based on the above diagnosis and in view of with the actual working conditions, comparison of the characteristics and application range of common treatment methods for karst cave, such as bridge plugging, cement plugging, drilling with lost circulation and sealing off with casing, bellow pipe plugging, gel plugging, well location relocation, was conducted with forced drilling with fresh water and sealing off with casing selected to drill to the intact formation and then casing set for sealing, which ensured the smooth completion of Well WND1 and the realization of drilling objectives.
keywords:shale gas geological survey  shale gas well  karst cave identification  drilling with lost circulation  casing-off  Well WND1  Lower Yangtze region
查看全文  查看/发表评论  下载PDF阅读器