地下连续墙液压抓斗在粘壤土地层施工中偏斜角度分析
投稿时间:2023-10-17  修订日期:2023-11-22  点此下载全文
引用本文:金赠伍,王清岩,盛洁,等.地下连续墙液压抓斗在粘壤土地层施工中偏斜角度分析[J].钻探工程,2024,51(2):39-46.
JIN Zengwu,WANG Qingyan,SHENG Jie,et al. Analysis of deviation angle of hydraulic grab for diaphragm wall in the construction of clay loam strata[J]. Drilling Engineering, 2024,51(2):39-46.
摘要点击次数: 132
全文下载次数: 272
作者单位E-mail
金赠伍 吉林大学建设工程学院吉林 长春 130026 3120206177@qq.com 
王清岩* 吉林大学建设工程学院吉林 长春 130026
自然资源部复杂条件钻采技术重点实验室吉林 长春 130026 
wangqy@jlu.edu.cn 
盛洁 中水东北勘测设计研究有限责任公司吉林 长春 130061  
钟蔚岭 吉林大学建设工程学院吉林 长春 130026  
中文摘要:在液压抓斗进行地下连续墙施工过程中,斗体需要保持一定的垂直度以保证侧壁成槽精度。抓斗掘削部与土体相互作用时,作用于斗体上的载荷具有瞬态多向性且不均匀,由此导致钢丝绳下放的斗体发生偏斜,成槽壁面垂直度受到破坏。本文建立了液压抓斗多体动力学模型和粘壤土地层模型,通过多体动力学和离散元相结合的方法分析了液压抓斗在粘壤土地层施工过程中斗体倾斜情况,设计了电液比例调速回路以控制液压抓斗主液压缸运动,通过联合仿真重点讨论了主液压缸控制信号对斗体偏斜过程的影响,为进一步研究液压抓斗纠偏系统及控制策略提供依据。
中文关键词:液压抓斗  斗体偏斜  电液比例调速回路  控制信号  联合仿真  粘壤土地层
 
Analysis of deviation angle of hydraulic grab for diaphragm wall in the construction of clay loam strata
Abstract:During the construction of diaphragm wall using hydraulic grab, the grab needs to maintain vertical to ensure the accuracy of the side wall trench formation. When the excavation part of the grab interacts with the soil, the load acting on the grab has the characteristics of transient multidirectivity and non-uniformity, which leads to the deviation of the grab lowered by the steel rope and damages of the verticality of the trench wall surface. This article established a multi-body dynamic model of hydraulic grab and a clay soil layer model. Through the combination of multi-body dynamic and discrete element method, the tilt of the grab during the construction process of the hydraulic grab in the clay soil layer is analyzed, and an electro-hydraulic proportional speed control circuit to control the movement of the main hydraulic cylinder of the hydraulic grab is designed. Through joint simulation, the influence of the control signal of the main hydraulic cylinder on the tilt process of the grab is emphatically discussed, which provides a basis for further research on the hydraulic grab deviation correction system and control strategy.
keywords:diaphragm wall hydraulic grab  grab deviation  electro-hydraulic proportional speed control circuit  control signal  joint simulation  clay loam strata
查看全文  查看/发表评论  下载PDF阅读器