青海贵德地区DR1地热井井旁涌水原因分析 及处理工艺应用研究 |
投稿时间:2018-07-02 修订日期:2018-07-02 点此下载全文 |
引用本文:赵东阳,赵振,罗银飞,等.青海贵德地区DR1地热井井旁涌水原因分析 及处理工艺应用研究[J].钻探工程,2018,45(10):87-90.ZHAO Dong-yang,ZHAO Zhen,LUO Yin-fei,et al. Causes and Treatment of Water Gushing at DR1 Geothermal Well in Guide, Qinghai[J]. Drilling Engineering, 2018,45(10):87-90. |
摘要点击次数: 756 |
全文下载次数: 610 |
|
基金项目:青海省科学技术厅基金项目“青海省贵德县扎仓沟地热田热储特征及热能潜力研究”(编号:2016-2J-769) |
|
中文摘要:地热资源属于清洁能源,主要通过地热井方式进行开发利用,成井工艺质量决定地热资源开发利用。贵德盆地DR1地热井由于成井时间较长,出现井旁涌水事故。本文详细分析了井旁涌水原因,采用合理方式成功处理涌水事故。为类似地热工程提供借鉴。 |
中文关键词:贵德盆地 地热井 井旁涌水 清洁能源 |
|
Causes and Treatment of Water Gushing at DR1 Geothermal Well in Guide, Qinghai |
|
|
Abstract:Due to the long time of well completion in a geothermal well in the Guide Basin, a water inrush accident occurred along the well. This paper analyzes the reasons for water inflow from the well side and uses a reasonable method to successfully treat the water inrush accident. To provide a reference for similar geothermal projects. |
keywords:Guide Basin geothermal wells well water gushing applied research clean energy |
查看全文 查看/发表评论 下载PDF阅读器 |