Bored Pile Construction of An Overhead Crossing Bridge Foundation
Author:
Affiliation:
Fund Project:
摘要
|
图/表
|
访问统计
|
参考文献
|
相似文献
|
引证文献
|
资源附件
|
文章评论
摘要:
阐述了郑州金水路立交桥基础桩工程施工中采用的主要技术装备、技术工艺和施工中几个问题的处理措施。
Abstract:
This paper describes the main equipment and technique employed in the foundation pile construc-tion for the overhead crossing bridge on Jinshui road in Zhengzhou and the measures taken to deal with a fewproblems in construction.
参考文献
相似文献
引证文献
引用本文
石昆山.某立交桥基础钻孔灌注桩施工实践[J].钻探工程,1995,(4):18-20.hi Kunshan. Bored Pile Construction of An Overhead Crossing Bridge Foundation[J]. Drilling Engineering, 1995,(4):18-20.