Concrete Seepage Cut-off Wall Construction for a River-crossing Dam
Author:
Affiliation:

Fund Project:

  • 摘要
  • |
  • 图/表
  • |
  • 访问统计
  • |
  • 参考文献
  • |
  • 相似文献
  • |
  • 引证文献
  • |
  • 资源附件
  • |
  • 文章评论
    摘要:

    拦河坝砼防渗墙多在砂层与砂卵石层上施工。地基处理根据地质条件选择,施工方法有无导孔挖槽、导孔挖槽、冲击成槽、回转钻成槽、锯槽机成槽。锯槽机为新型防渗成墙材料提供了新的施工手段,但有局限性。

    Abstract:

    The seepage cut -off wall for the river-crossing dam is usually installed in the sand and the sandy gravel. The dam site treatment depends on the geological conditions and the construction methods include trench-cutting without pilot hole, trench-cutting with pilot hole, percussive trenching, rotsry trenching and trenching by trench saw. The trench saw provides a new construction method for the new seepage cut-off walling material, but has its limitation.

    参考文献
    相似文献
    引证文献
引用本文

曾鹏九.拦河坝砼防渗墙的施工技术[J].钻探工程,1996,(5):46-48.
Zeng Pengjiu. Concrete Seepage Cut-off Wall Construction for a River-crossing Dam[J]. Drilling Engineering, 1996,(5):46-48.

复制
分享
文章指标
  • 点击次数:
  • 下载次数:
  • HTML阅读次数:
  • 引用次数:
历史
  • 收稿日期:
  • 最后修改日期:
  • 录用日期:
  • 在线发布日期:
  • 出版日期: 1996-09-25