长江三峡水利枢纽永久船闸高精度锚索孔施工工艺
DOI:
作者:
作者单位:

作者简介:

通讯作者:

中图分类号:

TV66

基金项目:


High Accuracy Cable Bolt Hole Drilling Technology for Perpetual Ship Gate of Water Conservancy Pivot at the Changjiang Three Gorges
Author:
Affiliation:

Fund Project:

  • 摘要
  • |
  • 图/表
  • |
  • 访问统计
  • |
  • 参考文献
  • |
  • 相似文献
  • |
  • 引证文献
  • |
  • 资源附件
  • |
  • 文章评论
    摘要:

    就水平锚索孔的偏斜、导直机理和施工工艺作了分析和论述。采用水平孔导直理论和施工工艺在长江三峡永久船闸锚索孔施工中取得了良好的效果。

    Abstract:

    The deviation and pilot drilling mechanism and drilling technology of the horizontal cable bolt hole are analyzed and discussed in this paper The application of the horizontal pilot drilling theory and drilling technology to the cable bolt hole drilling for the perpetual ship gate at the Changjiang Three Gorges achieves good results

    参考文献
    相似文献
    引证文献
引用本文

田野.长江三峡水利枢纽永久船闸高精度锚索孔施工工艺[J].钻探工程,1999,(2):22-24.
Tian Ye. High Accuracy Cable Bolt Hole Drilling Technology for Perpetual Ship Gate of Water Conservancy Pivot at the Changjiang Three Gorges[J]. Drilling Engineering, 1999,(2):22-24.

复制
分享
文章指标
  • 点击次数:
  • 下载次数:
  • HTML阅读次数:
  • 引用次数:
历史
  • 收稿日期:
  • 最后修改日期:1998-05-03
  • 录用日期:
  • 在线发布日期:
  • 出版日期: 1999-03-25