The profile of the Lijiagou Road Tunnel carried out the short bench and full face excavation. The re bar net preliminary lining mould shotcrete and preliminary and anchor shotcrete are used for support by the use of the semi wet spraying method with sand entrapped in cement. The lining is completed in two steps. Smooth surface blasting is performed.