Several problems frequent encountered during underground pipeline thrusting in new distriction of east Zhenzhou, including water level lowing, pit supporting, cave-in during thrusting, deviation, surface settlement and so on, were introduced. The causes of the problems were analyzed. The concept of the problem settlement was put forward.