Due to the change of design of Wenhua Mansion, bored piles need constructed on the storey which has been constructed. Through the mechanics analysis of the mayor component-beam AB and the reinforcement of the beam, the construction problems of bored pile on storey were solved.
参考文献
相似文献
引证文献
引用本文
骆嘉成,张海鋆.楼层上钻孔灌注桩施工方案可行性分析[J].钻探工程,2004,31(8):19-20.LUO Jia-cheng, ZHANG Hai-jun. The Feasibility Study Concerned with Construction Scheme of Bored Pile on Storey[J]. Drilling Engineering, 2004,31(8):19-20.