The construction techniques of excavating tunnel under shallow cover which is Ⅱ、Ⅲtype surround rocks in city was introduced. “Short excavation, quickly closed, strongly support and frequently measuring” were taken as guidance during construction. The tunnel was excavated separating upper and down parts. The prompt initial support ensured the safe construction.
参考文献
相似文献
引证文献
引用本文
李耀卿.浅埋暗挖技术在南平市天台隧道工程施工中的应用[J].钻探工程,2005,32(12):56-58.LI Yao-qing. Application of Underground Excavation under Shallow Cover in Tunnel Construction[J]. Drilling Engineering, 2005,32(12):56-58.