The causes of engineering defections were analyzed, taking the non-uniform floating in box-foundation. The ways, which are high pressure grouting and anti-lifting anchor piles, to treat the defections were given.
参考文献
相似文献
引证文献
引用本文
夏彦.箱形基础上浮病害整治技术[J].钻探工程,2005,32(6):1-2.XIA Yan. Treatment for Up Floating Defection Box-foundation[J]. Drilling Engineering, 2005,32(6):1-2.