高强锚杆在深部煤矿巷道支护中的应用
DOI:
CSTR:
作者:
作者单位:

作者简介:

通讯作者:

中图分类号:

TD353.6

基金项目:


Application of High Strength Anchor in Supporting for Deep Coal Mine Tunnel
Author:
Affiliation:

Fund Project:

  • 摘要
  • |
  • 图/表
  • |
  • 访问统计
  • |
  • 参考文献
  • |
  • 相似文献
  • |
  • 引证文献
  • |
  • 资源附件
  • |
  • 文章评论
    摘要:

    根据深部软岩条件下煤矿巷道锚杆支护效果不理想的情况,分析认为调整锚杆预紧力的大小是改善支护效果的有效方法。通过在具体支护中对螺纹钢锚杆、淮北预紧力锚杆、高预紧力锚杆进行对比试验,采用高预紧力锚杆支护有效地控制住了深部巷道围岩的变形,同时具有较好的经济效益。

    Abstract:

    The shoring results for coal mine under the soft rock conditions were not perfect. The author thought that adjustment of pre-stress in a efficient method to improve shoring results. Test was made on worm steel anchor, Huaibei pre-stressed anchor and high pre-stress anchor, to compare the shoring results. The high pre-stress anchor shown that it can efficiently control the surrounding rock deformation in tunnel under deep earth. Meanwhile it has good economic benefits.

    参考文献
    相似文献
    引证文献
引用本文

高杰,刘玉元,张京泉.高强锚杆在深部煤矿巷道支护中的应用[J].钻探工程,2006,33(1):55-58.
GAO Jie, LIU Yu-yuan, ZHANG Jing-quan. Application of High Strength Anchor in Supporting for Deep Coal Mine Tunnel[J]. Drilling Engineering, 2006,33(1):55-58.