Following the specification of road foundation construction, the practical blasting method for slope excavation was given out under the general road foundation construction conditions, to meet the quality requirements of cut slope construction along the rail and high way, and to reduce the work increment brought by trim blasting method. The possibility, necessity and reasonableness of using trim blasting and presplit blasting were analyzed on technological and engineering views.
参考文献
相似文献
引证文献
引用本文
彭泽波,吴毅.路堑边坡爆破开挖方法的探讨[J].钻探工程,2006,33(3):57-61.PENG Ze-bo, WU Yi. Discussion on Blasting Excavation Method of Cut Slope[J]. Drilling Engineering, 2006,33(3):57-61.