In plateau ever-frozen ground region with harsh climate and vulnerable ecological environment, various conditions of frozen soil layer bring difficulties to the construction of cast-in-place pile. To be up to the related standard of qualification, safety and environment protection, kinds of calamity initiated by the distortion, intensity weakness, cold expansion and melting breakdown caused by the frozen soil must be managed to prevent and remove. Construction technology of cast-in-place pile used for Buqu River is detailed. It is obviously different from normal technology used in land but effective in plateau ever-frozen ground and it can be referred to construction in similar geological conditions.
参考文献
相似文献
引证文献
引用本文
谭佳良,卿启斌,周旭荣.布曲河特大桥钻孔灌注桩施工工艺[J].钻探工程,2006,33(8):17-20.TAN Jia-liang, QING Qi-bin, ZHOU Xu-rong. Construction Technology of Bored Cast-in-place Pile Used for Outsize Bridge Over Buqu River[J]. Drilling Engineering, 2006,33(8):17-20.