The problem of anchor cable drilling is most difficult in anchor cable construction. This article mainly introduces the processing method to deal with drill burying and core blockage through drill bit and drill pipes improving, inversing drilling, sidetrack drilling and conservative drilling. Some methods for improving the grouting is also introduced to solve the problem of fluid leaking and make the injecting of anchoring section more sufficiency.
参考文献
相似文献
引证文献
引用本文
王伟 汪友平.锚索施工中的事故处理与注浆改进[J].钻探工程,2006,33(9):43-45.WANG Wei, WANG You-ping. Dealing with the Accident in Anchor Cable Construction and the Improvement on Grouting[J]. Drilling Engineering, 2006,33(9):43-45.