套管法灌注水下砼结合后压浆工艺在预应力管桩补强加固中的应用
DOI:
作者:
作者单位:

作者简介:

通讯作者:

中图分类号:

TU473.13

基金项目:


Application of Underwater Concrete Casting with Casing and Post Grouting Technology in Rehabilitation of Prestressed Pipe Pile
Author:
Affiliation:

Fund Project:

  • 摘要
  • |
  • 图/表
  • |
  • 访问统计
  • |
  • 参考文献
  • |
  • 相似文献
  • |
  • 引证文献
  • |
  • 资源附件
  • |
  • 文章评论
    摘要:

    通过工程实例,介绍了预应力管桩受损后采用套管法水下砼灌注工艺灌注桩心砼结合后压浆工艺对管桩断裂面注浆加固的工艺方法,并对实际施工前后的检测结果进行了对比。

    Abstract:

    The damage of pre-stressed pipe pile was treated by concrete core grouting of cast-in-place pile with casing underwater cement grouting technology and grouting reinforcement for fracture surface with post grouting in field cases, comparison was made on test results around the construction operation.

    参考文献
    相似文献
    引证文献
引用本文

周东明 范新庭.套管法灌注水下砼结合后压浆工艺在预应力管桩补强加固中的应用[J].钻探工程,2007,34(10):49-51.
ZHOU Dong-ming, FAN Xin-ting. Application of Underwater Concrete Casting with Casing and Post Grouting Technology in Rehabilitation of Prestressed Pipe Pile[J]. Drilling Engineering, 2007,34(10):49-51.