With the case of ‘The First Crossing’ of Phase Ⅱ Project in Zhuhai-Zhongshan gas transportation pipeline, the paper expounds the main working contents and methods of soil and rock exploration for crossing large river with directional drilling, analyzes the project design, problems in rock and soil engineering and the countermeasure.
参考文献
相似文献
引证文献
引用本文
郭凤菊.大型河流定向钻进穿越工程的岩土工程勘察探讨[J].钻探工程,2008,35(9):56-58.GUO Feng-ju. Discussion on Rock and Soil Exploration for Crossing Large River with Directional Drilling[J]. Drilling Engineering, 2008,35(9):56-58.