干河煤矿清理斜巷K2灰岩高压含水层预注浆施工技术
DOI:
作者:
作者单位:

作者简介:

通讯作者:

中图分类号:

基金项目:


Pre-grouting Technology in High-pressure Water-bearing Stratum of K2 Calcareous Rock in Cleaning Slanting Lane of Ganhe Coal Mine
Author:
Affiliation:

Fund Project:

  • 摘要
  • |
  • 图/表
  • |
  • 访问统计
  • |
  • 参考文献
  • |
  • 相似文献
  • |
  • 引证文献
  • |
  • 资源附件
  • |
  • 文章评论
    摘要:

    霍州煤电集团有限责任公司干河煤矿主井清理斜巷需穿越K2灰岩含水层,其含水层带压达5 MPa,水文地质条件复杂。主要介绍了对高压含水层的注浆堵水工艺,为巷道的安全掘进、防止巷道突水提供了可行的借鉴经验。

    Abstract:

    The slanting lane for cleaning up the main shaft of Huozhou coal electricity group Limited company was planed to pass through the water-bearing stratum of K2 calcareous rock, where the hydrogeological conditions is complicated and its water-bearing stratum belt pressure reaches 5 MPa. To avoid water bursting, this paper introduces the technology of grouting in high-pressure water-bearing stratum, which provides feasible experience for tunneling security.

    参考文献
    相似文献
    引证文献
引用本文

申见红,王海军,杨慧明,等.干河煤矿清理斜巷K2灰岩高压含水层预注浆施工技术[J].钻探工程,2008,35(10):71-72,65.
SHEN Jian-hong, WANG Hao-jun, YANG Hui-ming, et al. Pre-grouting Technology in High-pressure Water-bearing Stratum of K2 Calcareous Rock in Cleaning Slanting Lane of Ganhe Coal Mine[J]. Drilling Engineering, 2008,35(10):71-72,65.

复制
分享
文章指标
  • 点击次数:
  • 下载次数:
  • HTML阅读次数:
  • 引用次数:
历史
  • 收稿日期:2008-02-27
  • 最后修改日期:
  • 录用日期:
  • 在线发布日期:
  • 出版日期: