盐井定向对接连通施工工艺
DOI:
作者:
作者单位:

作者简介:

通讯作者:

中图分类号:

基金项目:


Construction Technology of Directional Butting Connection for Salt Well
Author:
Affiliation:

Fund Project:

  • 摘要
  • |
  • 图/表
  • |
  • 访问统计
  • |
  • 参考文献
  • |
  • 相似文献
  • |
  • 引证文献
  • |
  • 资源附件
  • |
  • 文章评论
    摘要:

    山东新汶矿业集团ZJ02—PJ02对接井,直井ZJ02设计深度为94112 m,斜井PJ02井设计深度为120300 m,两井相距25200 m。设计井身为三开结构并合理配置钻探及造斜专用设备;为防止井斜采用塔式钟摆钻具;根据不同井段,合理选用钻压、钻速和泵量,配制不同的钻井液;采用高精度的PST随钻测斜和最小曲率法计算钻井轨迹,保证了两井的顺利对接连通。

    Abstract:

    The paper introduced ZJ02-PJ02 butted wells of Xinwen Mining Group, the designed depth of the shaft and the inclined well were 94112m and 120300m, and these two wells was 25200m apart. The designed well structure was trisected with drilling and angle building equipment rationally installed. Tower-type pendulum drilling-assembly was used to prevent well deviation. Drilling pressure, drilling ratio, pumping volume and drilling fluid were selected according to the different situation in different well section, highprecision PST MWD and minimum curvature method were applied to calculate the drilling trajectory to guarantee the butting of two wells.

    参考文献
    相似文献
    引证文献
引用本文

王强,柴宿县,董梅.盐井定向对接连通施工工艺[J].钻探工程,2008,35(11):13-16.
WANG Qiang, CHAI Su-xian, DONG Mei. Construction Technology of Directional Butting Connection for Salt Well[J]. Drilling Engineering, 2008,35(11):13-16.

复制
分享
文章指标
  • 点击次数:
  • 下载次数:
  • HTML阅读次数:
  • 引用次数:
历史
  • 收稿日期:2008-05-18
  • 最后修改日期:
  • 录用日期:
  • 在线发布日期:
  • 出版日期: