梨深1井Φ244.5 mm套管固井前的井漏处理
DOI:
作者:
作者单位:

作者简介:

通讯作者:

中图分类号:

TE256

基金项目:


Well Leakage Treatment on 244.5mm Case of Well Lishen 1 before Cementing
Author:
Affiliation:

Fund Project:

  • 摘要
  • |
  • 图/表
  • |
  • 访问统计
  • |
  • 参考文献
  • |
  • 相似文献
  • |
  • 引证文献
  • |
  • 资源附件
  • |
  • 文章评论
    摘要:

    在地层承压能力较低的地区进行套管固井作业,由于水泥浆密度较大,极易发生井内漏失,影响封固质量、影响钻井设计目的与要求,因此做好固井前地层承压堵漏是一个很重要的工作环节。通过对漏层进行分析,采用合理的堵漏方法进行承压堵漏,确保了固井的顺利作业。

    Abstract:

    Because of high density of cementing slurry, borehole leakage often occurs while casing cementing operated in the area with low formation bearing pressure. Pressure sealing before well cementing is important to guarantee cementing quality and drilling design. Cementing of Well Lishen 1 was successfully operated by the analysis on the leakage zone and rational leakage stopping.

    参考文献
    相似文献
    引证文献
引用本文

祃树攀.梨深1井Φ244.5 mm套管固井前的井漏处理[J].钻探工程,2009,36(8):37-38.
MA Shu-pan. Well Leakage Treatment on 244.5mm Case of Well Lishen 1 before Cementing[J]. Drilling Engineering, 2009,36(8):37-38.

复制
分享
文章指标
  • 点击次数:
  • 下载次数:
  • HTML阅读次数:
  • 引用次数:
历史
  • 收稿日期:2009-03-24
  • 最后修改日期:2009-03-24
  • 录用日期:2009-06-15
  • 在线发布日期: 2009-09-02
  • 出版日期: 2009-08-25