The paper introcuced the drilling construction technology of Shanghai-Chengdu high speed railway in karst strutum, together with the equipments selection, technical parameters determination and the treatment & prevention for commom accidences of drilling construction in such strutum.
参考文献
相似文献
引证文献
引用本文
杨宗仁,史学伟.沪-蓉高速铁路跨越汉江特大桥桩孔施工技术[J].钻探工程,2010,37(2):47-50.YANG Zong-ren, SHI Xue-wei. Construction Technology of Pile Hole for Shanghai-Chengdu High Speed Railway Overpassing Hanjiang Super-long Bridge[J]. Drilling Engineering, 2010,37(2):47-50.