鄂尔多斯盆地镇泾工区钻井堵漏技术措施
DOI:
作者:
作者单位:

作者简介:

通讯作者:

中图分类号:

基金项目:


Lost Circulation Prevention in Zhenjing Oil Field of Erdos Basin
Author:
Affiliation:

Fund Project:

  • 摘要
  • |
  • 图/表
  • |
  • 访问统计
  • |
  • 参考文献
  • |
  • 相似文献
  • |
  • 引证文献
  • |
  • 资源附件
  • |
  • 文章评论
    摘要:

    鄂尔多斯盆地镇泾工区钻井中遇到井漏难题,针对不同的漏失特点采用不同方法堵漏。第四系黄土层漏失采取控时钻进加短程起下钻方法;渗透性砂岩层漏失采用以预防为主,随钻加入单封堵漏方法;纵向裂隙层漏失采用复合堵漏材料方法,恶性漏失采用桥接材料+水泥封堵方法。实践证明,所采用的堵漏技术措施有效。

    Abstract:

    According to the characteristics of lost circulation in drilling in Zhenjing oil field, the treatment methods were adopted for different cases. Time-controlled drilling and short pipe-trip was for the lost circulation in the quaternary loess layer, prevention and drilling with unidirectional pressure temporary plugging additive was for the lost in permeable sand-stone layer, composite cement slurry was for vertical fracture layer and bridge material + cementing was for serious loss. All of these lost circulation control technologies were proved effective.

    参考文献
    相似文献
    引证文献
引用本文

俞宪生.鄂尔多斯盆地镇泾工区钻井堵漏技术措施[J].钻探工程,2009,36(6):19-20,23.
YU Xian-sheng. Lost Circulation Prevention in Zhenjing Oil Field of Erdos Basin[J]. Drilling Engineering, 2009,36(6):19-20,23.