藏木水电站某标段边坡预应力锚固工程风险评价模型
DOI:
作者:
作者单位:

作者简介:

通讯作者:

中图分类号:

TV512

基金项目:


Risk Assessment Model for Slope Pre-stressed Anchor Engineering in a Contract Section of Zangmu Hydropower Station
Author:
Affiliation:

Fund Project:

  • 摘要
  • |
  • 图/表
  • |
  • 访问统计
  • |
  • 参考文献
  • |
  • 相似文献
  • |
  • 引证文献
  • |
  • 资源附件
  • |
  • 文章评论
    摘要:

    藏木水电站某标段边坡预应力锚固工程施工中面临众多的风险,且存在多种不确定因素,项目管理难度大。构建了项目风险评价指标体系,使用三标度法和层次分析法对指标进行权重分析,引入了模糊综合评判模型,将管理者和专家的经验由定性转为定量,对项目风险进行了定量化评价,评价结论为“风险较大”,为进一步制定项目管理方案提供了依据。

    Abstract:

    There are many risk factors and uncertainties in the slope pre-stressed anchor engineering construction in a contract section of Zangmu hydropower station, so the project management is very difficult. The risk assessment index system was established, index weight analysis was conducted by using three-demarcation method and AHP, fuzzy comprehensive evaluation model was introduced, the managers and experts’ experience was changed from qualitative to quantitative, and quantitative assessment of the project risk was made with the result of “high risk”. All of the above offered the basis for further project management scheme establishing.

    参考文献
    相似文献
    引证文献
引用本文

吴丽,陈礼仪,吴飞.藏木水电站某标段边坡预应力锚固工程风险评价模型[J].钻探工程,2010,37(7):70-73.
WU Li, CHEN Li-yi, WU Fei. Risk Assessment Model for Slope Pre-stressed Anchor Engineering in a Contract Section of Zangmu Hydropower Station[J]. Drilling Engineering, 2010,37(7):70-73.

复制
分享
文章指标
  • 点击次数:
  • 下载次数:
  • HTML阅读次数:
  • 引用次数:
历史
  • 收稿日期:2010-02-04
  • 最后修改日期:2010-02-04
  • 录用日期:2010-05-14
  • 在线发布日期: 2010-07-22
  • 出版日期: 2010-07-25