The paper introduces a new uplift pile, part-bonding pre-stress uplift pile. It effectively improves the pile shaft structure; can make full use of the bearing capacity, remodel the mechanical characteristic of the stretched concrete and overcome the cracks of the normal uplift pile. Optimal design was made on the uplift pile by combining the research on underground structure buoyancy with the on-site test on part-bonding pre-stress.
参考文献
相似文献
引证文献
引用本文
何世鸣,郭跃龙,赵晓东,等.部分粘结预应力抗拔(浮)桩的优化设计[J].钻探工程,2010,37(7):39-43.HE Shi-ming, GUO Yue-long, ZHAO Xiao-dong, et al. Optimal Design of Part-bonding Pre-stress Uplift Pile[J]. Drilling Engineering, 2010,37(7):39-43.