Based on the successful experience of the application of combined seepage draining technology with horizontal drainage hole, gravel pile and blind ditch in a tailings reservoir of Xiangshan pyrite mine, the paper introduced the construction process of horizontal drainage hole in tailings reservoir and the application prospect of this technology.
参考文献
相似文献
引证文献
引用本文
阮茂盛,刘庆祥.向山硫铁矿尾矿库联合排渗施工技术[J].钻探工程,2011,38(3):71-73.RUAN Mao-sheng, LIU Qing-xiang. Construction Technology of Combined Seepage Draining in Tailings Reservoir of Xiangshan Pyrite Mine[J]. Drilling Engineering, 2011,38(3):71-73.