The horizontal well H024U is used to connect the first and the second target-vertical well V024 and V024U. The advanced construction technology of brine mining connection well and the magnetic measurement guiding system with high technology content & independent intellectual property right manufactured by the Institute of Exploration Techniques (achievement of geological investigation project) were adopted in the construction. Based on the construction experience of horizontal wells in Turkey, the drilling parameters were carefully designed and controlled, accurate target hitting was realized with hitting the production casing bottom of V024U to realize the accurate well connection.
参考文献
相似文献
引证文献
引用本文
隆东,张新刚,岳刚,等. H024U井施工工艺及精确中靶技术措施[J].钻探工程,2011,38(3):5-8,12.LONG Dong, ZHANG Xin-gang, YUE Gang, et al. Construction Technology of Well H024U and the Technical Measures of Accurate Target Hitting[J]. Drilling Engineering, 2011,38(3):5-8,12.