强夯法处理湿陷性黄土工程实践
DOI:
作者:
作者单位:

作者简介:

通讯作者:

中图分类号:

TU472.3

基金项目:


Engineering Practice of Dynamic Compaction Method for Treating Collapsible Losses
Author:
Affiliation:

Fund Project:

  • 摘要
  • |
  • 图/表
  • |
  • 访问统计
  • |
  • 参考文献
  • |
  • 相似文献
  • |
  • 引证文献
  • |
  • 资源附件
  • |
  • 文章评论
    摘要:

    以同煤集团塔山洗煤厂为例,探讨了强夯法在湿陷性黄土中的应用,提出了强夯法处理黄土的适用条件、强夯方案的确定原则、地基土含水量对强夯施工效果的影响等论点,尤其是用复合地基理论确定强夯地基承载力的方法。

    Abstract:

    Take an engineering example of a coal preparation plant, discussion was made on the application of dynamic compaction method in collapsible losses. The applicable conditions, the scheme determination principles, the influence of foundation soil water content to dynamic compaction construction effect and especially the determination method of dynamic compaction foundation bearing capacity by composite foundation theory were put forward.

    参考文献
    相似文献
    引证文献
引用本文

郭春平.强夯法处理湿陷性黄土工程实践[J].钻探工程,2011,38(6):59-61.
GUO Chun-ping. Engineering Practice of Dynamic Compaction Method for Treating Collapsible Losses[J]. Drilling Engineering, 2011,38(6):59-61.

复制
分享
文章指标
  • 点击次数:
  • 下载次数:
  • HTML阅读次数:
  • 引用次数:
历史
  • 收稿日期:2010-11-13
  • 最后修改日期:2011-05-25
  • 录用日期:2011-05-25
  • 在线发布日期: 2011-06-24
  • 出版日期: 2011-06-25