锦屏一级水电站坝基无盖重固结灌浆施工工艺探讨
DOI:
作者:
作者单位:

作者简介:

通讯作者:

中图分类号:

TV543

基金项目:


Discussion on Construction Technology of Consolidation Grouting without Concrete Covering for Dam Foundation in Jinping 1 Hydropower Station
Author:
Affiliation:

Fund Project:

  • 摘要
  • |
  • 图/表
  • |
  • 访问统计
  • |
  • 参考文献
  • |
  • 相似文献
  • |
  • 引证文献
  • |
  • 资源附件
  • |
  • 文章评论
    摘要:

    锦屏一级水电站大坝由于基础层混凝土仓面面积大,温控要求严格、间歇期短,固结灌浆施工与坝体混凝土温控存在较大矛盾,主要采取无盖重固结灌浆加有盖重补强固结灌浆及引管的方式进行。主要就无盖重固结灌浆主要存在问题进行了分析和探讨。

    Abstract:

    In Jinping 1 hydropower station, because of large concrete surface of dam foundation, strict temperature control, short construction interval and the contradiction between consolidation grouting and concrete temperature control, both consolidation grouting without concrete covering and reinforced consolidation grouting with concrete covering were adopted. The paper analyzed and discussed the main problems of consolidation grouting without concrete covering.

    参考文献
    相似文献
    引证文献
引用本文

杨世伟,李德勇.锦屏一级水电站坝基无盖重固结灌浆施工工艺探讨[J].钻探工程,2011,38(8):56-58,63.
YANG Shi-wei, LI De-yong. Discussion on Construction Technology of Consolidation Grouting without Concrete Covering for Dam Foundation in Jinping 1 Hydropower Station[J]. Drilling Engineering, 2011,38(8):56-58,63.

复制
分享
文章指标
  • 点击次数:
  • 下载次数:
  • HTML阅读次数:
  • 引用次数:
历史
  • 收稿日期:2010-12-15
  • 最后修改日期:2010-12-15
  • 录用日期:2011-03-03
  • 在线发布日期: 2011-08-22
  • 出版日期: 2011-08-25