In the mid 1960s, the proven reserve was 93 million tons in Zhongguan iron mine area. Because of the deep groundwater table and difficult drainage, curtain grouting was adopted for water control to avoid high mining cost and protect the ecological environment. The curtain grouting has high demand of borehole verticality, hole deviation of the whole section should not be more than 2 m. Gyroscope directional deviation correction was explored in practice with success.
参考文献
相似文献
引证文献
引用本文
王扶志,张心剑,仝在平.陀螺仪定向纠斜法在中关铁矿区的应用实践[J].钻探工程,2011,38(6):40-42.WANG Fu-zhi, ZHANG Xin-jian, TONG Zai-ping. Application Practice of Gyroscope Directional Deviation Correction in Zhongguan Iron Mine Area[J]. Drilling Engineering, 2011,38(6):40-42.