SR-28地热井坍塌卡钻事故的处理
DOI:
作者:
作者单位:

作者简介:

通讯作者:

中图分类号:

TE249

基金项目:


Treatment of Drill Pipe Sticking in SR-28 Geothermal Well Collapsing Accident
Author:
Affiliation:

Fund Project:

  • 摘要
  • |
  • 图/表
  • |
  • 访问统计
  • |
  • 参考文献
  • |
  • 相似文献
  • |
  • 引证文献
  • |
  • 资源附件
  • |
  • 文章评论
    摘要:

    就SR-28地热井出现的由坍塌引起的卡钻事故原因进行了分析,针对事故原因分别采用了套铣、测卡、爆炸松扣等技术手段进行了处理,并取得了成功。介绍了该井事故的处理技术措施。

    Abstract:

    In this paper, analysis was made on the causes of drill pipe sticking accident of SR-28 geothermal well by collapsing. According to the different causes, casing mill, measuring sticking point and breaking pack of dynamite and other technical means were adopted, the accident was successfully treated.

    参考文献
    相似文献
    引证文献
引用本文

李振杰,徐云鹏,王平,等. SR-28地热井坍塌卡钻事故的处理[J].钻探工程,2011,38(9):49-51.
Li Zhen-jie, Xu Yun-peng, WANG Ping, et al. Treatment of Drill Pipe Sticking in SR-28 Geothermal Well Collapsing Accident[J]. Drilling Engineering, 2011,38(9):49-51.

复制
分享
文章指标
  • 点击次数:
  • 下载次数:
  • HTML阅读次数:
  • 引用次数:
历史
  • 收稿日期:2011-05-27
  • 最后修改日期:2011-07-11
  • 录用日期:2011-08-07
  • 在线发布日期: 2011-09-28
  • 出版日期: