采用横穿集水管法整治石太客运专线路基表层冻害
DOI:
作者:
作者单位:

作者简介:

通讯作者:

中图分类号:

U418.6

基金项目:


Renovation of Frozen Harzard of Subgrade Surface by Cross Water-collecting Pipe for Shijiazhuang-Taiyuan Passenger Dedicated Railway
Author:
Affiliation:

Fund Project:

  • 摘要
  • |
  • 图/表
  • |
  • 访问统计
  • |
  • 参考文献
  • |
  • 相似文献
  • |
  • 引证文献
  • |
  • 资源附件
  • |
  • 文章评论
    摘要:

    石太客运专线路基大多数位于黄土地段,开通运营后2009年首个冬季发生大量冻害,其中以路基冻害居多。采用横穿集水管工程措施对路基冻害进行了整治,取得了较好的整治效果,提供了可借鉴经验。

    Abstract:

    Most of the subgrade of Shijiazhuang-Taiyuan passenger dedicated railway is located in loes section. This raiway was put into operation in 2009, but a large amount of frozen harzard occurred in the first winter and most was in subgrade. The renovation was made by engineering measure of cross water-collecting pipe with good effect.

    参考文献
    相似文献
    引证文献
引用本文

李荣功,唐世杰.采用横穿集水管法整治石太客运专线路基表层冻害[J].钻探工程,2012,39(1):65-67.
LI Rong-gong, TANG Shi-jie. Renovation of Frozen Harzard of Subgrade Surface by Cross Water-collecting Pipe for Shijiazhuang-Taiyuan Passenger Dedicated Railway[J]. Drilling Engineering, 2012,39(1):65-67.

复制
分享
文章指标
  • 点击次数:
  • 下载次数:
  • HTML阅读次数:
  • 引用次数:
历史
  • 收稿日期:2011-09-02
  • 最后修改日期:2011-09-02
  • 录用日期:2011-12-27
  • 在线发布日期: 2012-01-10
  • 出版日期: 2012-01-25