安溪黄厝坪铁矿区复杂地层钻孔护壁堵漏实践
DOI:
CSTR:
作者:
作者单位:

作者简介:

通讯作者:

中图分类号:

P634.8

基金项目:


Practice of Wall Protection and Leakage Control in Complex Formation of Huangcuoping Iron Mine of Anxi
Author:
Affiliation:

Fund Project:

  • 摘要
  • |
  • 图/表
  • |
  • 访问统计
  • |
  • 参考文献
  • |
  • 相似文献
  • |
  • 引证文献
  • |
  • 资源附件
  • |
  • 文章评论
    摘要:

    福建省安溪县黄厝坪铁矿区地层复杂,设计钻孔2个。01孔钻探中遇多孔段漏失,反复采用多种堵漏方法顺利终孔,但严重影响了钻探效率。经过总结经验和教训,在02孔施工中,对护壁堵漏措施进行了完善,较好地解决了钻进漏失问题,取得了良好的效果。介绍了2个钻孔的护壁堵漏过程,总结了在破碎漏失严重地层的堵漏对策以及堵漏方法的选择经验。

    Abstract:

    There are 2 designed boreholes in the complex formation in Huangcuoping iron mining area of Anxi, Fujian. Hole 01 drilling encountered leakage sections, several control methods were taken for the completion but drilling efficiency was seriously affected. The experience and lessons were summed up for the Hole 02, improvement was made on the wall protection and leakage control with good result. The paper introduced the process of wall protection and leakage control in the 2 holes, summed up the leakage control measures and the experience of selecting control method in serious broken and leakage formation.

    参考文献
    相似文献
    引证文献
引用本文

皮跃进,刘文华.安溪黄厝坪铁矿区复杂地层钻孔护壁堵漏实践[J].钻探工程,2011,38(9):16-17,20.
PI Yue-jin, LIU Wen-hua. Practice of Wall Protection and Leakage Control in Complex Formation of Huangcuoping Iron Mine of Anxi[J]. Drilling Engineering, 2011,38(9):16-17,20.

复制
分享
文章指标
  • 点击次数:
  • 下载次数:
  • HTML阅读次数:
  • 引用次数:
历史
  • 收稿日期:2011-09-04
  • 最后修改日期:2011-09-04
  • 录用日期:2011-09-05
  • 在线发布日期: 2011-09-28
  • 出版日期:
文章二维码