There are 2 designed boreholes in the complex formation in Huangcuoping iron mining area of Anxi, Fujian. Hole 01 drilling encountered leakage sections, several control methods were taken for the completion but drilling efficiency was seriously affected. The experience and lessons were summed up for the Hole 02, improvement was made on the wall protection and leakage control with good result. The paper introduced the process of wall protection and leakage control in the 2 holes, summed up the leakage control measures and the experience of selecting control method in serious broken and leakage formation.
参考文献
相似文献
引证文献
引用本文
皮跃进,刘文华.安溪黄厝坪铁矿区复杂地层钻孔护壁堵漏实践[J].钻探工程,2011,38(9):16-17,20.PI Yue-jin, LIU Wen-hua. Practice of Wall Protection and Leakage Control in Complex Formation of Huangcuoping Iron Mine of Anxi[J]. Drilling Engineering, 2011,38(9):16-17,20.