YR-3井井身井管结构设计及固井技术
DOI:
作者:
作者单位:

作者简介:

通讯作者:

中图分类号:

TE249

基金项目:


Design of Casing Program for YR-3 Well and the Cementing Technique
Author:
Affiliation:

Fund Project:

  • 摘要
  • |
  • 图/表
  • |
  • 访问统计
  • |
  • 参考文献
  • |
  • 相似文献
  • |
  • 引证文献
  • |
  • 资源附件
  • |
  • 文章评论
    摘要:

    以YR-3井为例,阐述了牛驮镇地热田从下伏石灰岩-白云岩完整地层钻取地热水时的多级成井结构及固井技术。该技术可有效地克服因地层漏失造成的孔壁坍塌及因设备能力偏小而造成的固井困难。经多眼井施工证明,该方法是牛驮镇地热田及类似地层地热井施工的有效方法。

    Abstract:

    With the example of YR-3 well, the paper discussed the multilevel well completion structure and cementing technology of drilling for geothermal water in underlying limestone-dolomite complete formation of Niutuozhen geothermal field. With this technology, borehole collapsing caused by circulation loss and cementing difficulties due to low equipment capacity can be effectively solved. Construction of several wells proved that it is a successful and effective method for Niutuozhen geothermal field and the similar ones.

    参考文献
    相似文献
    引证文献
引用本文

刘文新,张长茂,鲍洪智,等. YR-3井井身井管结构设计及固井技术[J].钻探工程,2012,39(6):35-38.
LIU Wen-xin, ZHANG Chang-mao, BAO Hong-zhi, et al. Design of Casing Program for YR-3 Well and the Cementing Technique[J]. Drilling Engineering, 2012,39(6):35-38.

复制
分享
文章指标
  • 点击次数:
  • 下载次数:
  • HTML阅读次数:
  • 引用次数:
历史
  • 收稿日期:2011-12-15
  • 最后修改日期:2012-02-03
  • 录用日期:2012-03-28
  • 在线发布日期: 2012-06-29
  • 出版日期: