大宝山钼矿复杂地层钻探技术
DOI:
作者:
作者单位:

作者简介:

通讯作者:

中图分类号:

P634.6

基金项目:

岩土钻掘与防护教育部工程研究中心2011年度开放基金资助


Drilling Technology in Complex Stratum of Dabaoshan Molybdenum Mine
Author:
Affiliation:

Fund Project:

  • 摘要
  • |
  • 图/表
  • |
  • 访问统计
  • |
  • 参考文献
  • |
  • 相似文献
  • |
  • 引证文献
  • |
  • 资源附件
  • |
  • 文章评论
    摘要:

    广东大宝山钼矿区地层复杂,钻孔施工中常发生漏失、掉块、坍塌垮孔、缩径等情况,易造成钻具折断,卡钻、烧钻、埋钻等事故,且取心困难。通过选择合理的钻探工艺方法、护壁堵漏措施和钻探取心技术措施,使大宝山钼矿床和北面山多金属区详查找矿钻探工作顺利完成。详细介绍了大宝山钼矿复杂地层钻探技术。

    Abstract:

    The stratum is complicated in Dabaoshan molybdenum mine. Leakage, block falling, borehole collapsing and diameter shrinkage often occurred and coring was difficult for drilling tool breaking, sticking, bit burning and burying. By selection of rational drilling technologies, wall protection and leakage control methods and drilling coring methods, the detailed survey and prospecting drilling were smoothly completed. The paper introduced the drilling technology in the complex formation of Dabaoshan molybdenum mine.

    参考文献
    相似文献
    引证文献
引用本文

王勇,孙平贺,赵仁明,等.大宝山钼矿复杂地层钻探技术[J].钻探工程,2012,39(11):22-25.
WANG Yong, SUN Ping-he, ZHAO Ren-ming, et al. Drilling Technology in Complex Stratum of Dabaoshan Molybdenum Mine[J]. Drilling Engineering, 2012,39(11):22-25.

复制
分享
文章指标
  • 点击次数:
  • 下载次数:
  • HTML阅读次数:
  • 引用次数:
历史
  • 收稿日期:2012-03-10
  • 最后修改日期:2012-10-15
  • 录用日期:2012-11-08
  • 在线发布日期: 2012-12-03
  • 出版日期: