某锚索抗滑桩板墙工程补强措施及负效应初探
DOI:
CSTR:
作者:
作者单位:

作者简介:

通讯作者:

中图分类号:

TU757

基金项目:


Discussion of Reinforcement Meassures for Anti-sliding Anchor Pile-plank Wall and Negative Effects
Author:
Affiliation:

Fund Project:

  • 摘要
  • |
  • 图/表
  • |
  • 访问统计
  • |
  • 参考文献
  • |
  • 相似文献
  • |
  • 引证文献
  • |
  • 资源附件
  • |
  • 文章评论
    摘要:

    介绍了高填方边坡治理工程补强措施,针对补强措施的负效应问题进行了力学分析,从岩土及工程力学角度探讨了负效应产生的原因,并就构件安全性及负效应的控制问题提出了个人见解。

    Abstract:

    The paper introduced reinforcement measures for high fill slope control project. According to the negative effects of reinforcement measures, mechanical analysis was made; the causes of negative effects were discussed in geotechnical and engineering mechanics, the personal views on components safety and negative effects control were put forward.

    参考文献
    相似文献
    引证文献
引用本文

和曙泉,徐国民.某锚索抗滑桩板墙工程补强措施及负效应初探[J].钻探工程,2012,39(9):75-79.
HE Shu-quan, XU Guo-min. Discussion of Reinforcement Meassures for Anti-sliding Anchor Pile-plank Wall and Negative Effects[J]. Drilling Engineering, 2012,39(9):75-79.

复制
分享
文章指标
  • 点击次数:
  • 下载次数:
  • HTML阅读次数:
  • 引用次数:
历史
  • 收稿日期:2012-03-19
  • 最后修改日期:2012-03-19
  • 录用日期:2012-06-08
  • 在线发布日期: 2012-09-26
  • 出版日期:
文章二维码