    根据东升水电站导流墙固结灌浆施工实践,总结了固结灌浆过程中钻孔、裂隙冲洗、压水试验、制浆、灌浆、封孔的原则和注意事项。对灌浆过程中所遇到的漏浆及串浆特殊情况,分别采取了待凝及塞住串浆孔的措施,并取得了较好的灌浆效果。

    Abstract:

    According to the consolidation grouting construction for diversion wall in Dongsheng hydropower station, the paper summarizes the principles and precautions of drilling, crack flushing, water pressure test, pulping, grouting and sealing in the process of consolidation grouting. Coagulation and string slurry plugging were taken to deal with slurry leakage and string slurry in the process of grouting construction with good grouting effect.

    参考文献
    相似文献
    引证文献
引用本文

刘卫卫,姜鹏飞,纪晓宇,等.东升水电站导流墙固结灌浆施工工艺[J].钻探工程,2012,39(9):71-74.
LIU Wei-wei, JIANG Peng-fei, JI Xiao-yu, et al. Consolidation Grouting Construction Technology for Diversion Wall in Dongsheng Hydropower Station[J]. Drilling Engineering, 2012,39(9):71-74.

复制
分享
文章指标
  • 点击次数:
  • 下载次数:
  • HTML阅读次数:
  • 引用次数:
历史
  • 收稿日期:2012-04-07
  • 最后修改日期:2012-07-22
  • 录用日期:2012-08-21
  • 在线发布日期: 2012-09-26
  • 出版日期:
文章二维码