    摘要:

    对深异形地下连续墙施工的关键点进行了系统的研究、探讨,归纳出了深异形地连墙施工的7个关键环节。分别对这7个重点问题进行了论述,并通过工程实例,对其应用效果加以验证。

    Abstract:

    The paper studied and discussed the difficult and important points of hadal depth & abnormal shape underground diaphragm wall and inducted 7 key links of construction for hadal depth & abnormal shape underground diaphragm wall. Discussion was made on these 7 issues by engineering case to verify the application effects.

    参考文献
    相似文献
    引证文献
引用本文

易智宏,赵建平,汪应朝,等.深异形地下连续墙施工技术研究[J].钻探工程,2012,39(11):44-50.
YI Zhi-hong, ZHAO Jian-ping, WANG Ying-chao, et al. Study on Construction Technique of Hadal Depth & Abnormal Shape Underground Diaphragm Wall[J]. Drilling Engineering, 2012,39(11):44-50.

复制
分享
文章指标
  • 点击次数:
  • 下载次数:
  • HTML阅读次数:
  • 引用次数:
历史
  • 收稿日期:2012-06-11
  • 最后修改日期:2012-09-29
  • 录用日期:2012-11-08
  • 在线发布日期: 2012-12-03
  • 出版日期: