汶川地震断裂带科学钻探项目钻探事故预防与处理技术
DOI:
作者:
作者单位:

作者简介:

通讯作者:

中图分类号:

P634.8

基金项目:

科技部科技支撑计划专项“汶川地震断裂带科学钻探(WFSD)”项目之“科学钻探与科学测井”课题


Drilling Accident Prevention in Wenchuan Earthquake Fault Scientific Drilling Project and the Treatment Technology
Author:
Affiliation:

Fund Project:

  • 摘要
  • |
  • 图/表
  • |
  • 访问统计
  • |
  • 参考文献
  • |
  • 相似文献
  • |
  • 引证文献
  • |
  • 资源附件
  • |
  • 文章评论
    摘要:

    汶川地震断裂带科学钻探工程的地层条件十分复杂,岩层破碎,膨胀缩径,不确定因素多,出现多次卡、断、落等孔内事故,但都科学诊断、成功处理。通过优化钻进方法、钻具结构及泥浆体系等多种事故预防措施,最大限度地减少事故发生,保证了科学钻探工程的顺利进行。

    Abstract:

    The formation conditions of Wenchuan earthquake fault scientific drilling project are very complicated. Broken rock formation, lost circulation and borehole shrinkage are encountered frequently. As a result, many drilling accidents, such as drill pipe sticking, drilling pipe breaking, objects dropping and so on happened and were successfully solved. Technical measures for preventing accidents, including scientific diagnosis and optimizing drilling method, drill tool structure and drilling mud system, have been taken to minimize accidents and ensure the smooth progress of scientific drilling project.

    参考文献
    相似文献
    引证文献
引用本文

吴金生,贾军,段玉刚,等.汶川地震断裂带科学钻探项目钻探事故预防与处理技术[J].钻探工程,2012,39(9):49-52,65.
WU Jin-sheng, JIA Jun, DUAN Yu-gang, et al. Drilling Accident Prevention in Wenchuan Earthquake Fault Scientific Drilling Project and the Treatment Technology[J]. Drilling Engineering, 2012,39(9):49-52,65.

复制
分享
文章指标
  • 点击次数:
  • 下载次数:
  • HTML阅读次数:
  • 引用次数:
历史
  • 收稿日期:2012-08-08
  • 最后修改日期:2012-08-08
  • 录用日期:2012-08-26
  • 在线发布日期: 2012-09-26
  • 出版日期: