汶川地震断裂带科学钻探项目WFSD-3-P孔钻探施工概况
DOI:
作者:
作者单位:

作者简介:

通讯作者:

中图分类号:

P634

基金项目:

科技部科技支撑计划专项“汶川地震断裂带科学钻探(WFSD)”项目之“科学钻探与科学测井”课题


Situation of WFSD-3-P Drilling Operation of Wenchuan Earthquake Fault Scientific Drilling Project
Author:
Affiliation:

Fund Project:

  • 摘要
  • |
  • 图/表
  • |
  • 访问统计
  • |
  • 参考文献
  • |
  • 相似文献
  • |
  • 引证文献
  • |
  • 资源附件
  • |
  • 文章评论
    摘要:

    主要介绍了汶川地震断裂带科学钻探项目WFSD-3-P孔的地层情况、施工过程、钻井液技术、事故的处理与预防技术。在钻探施工中,采取了高密度低失水泥浆体系和反复扫孔、起钻中途回灌泥浆的措施,解决了断层泥缩径、岩层破碎、钻孔坍塌扩径的技术难题,并取得了原状性完好的岩心。

    Abstract:

    This article introduces the drilling process of WFSD-3-P of Wenchuan earthquake fault scientific drilling (WFSD) project. A series of technical measures of high-density and low-filtration drilling fluid system, repeated reaming and mud recharging in pipe trip were taken to overcome drilling difficulties, such as borehole shrinkage in fault gouge formation, rock breaking and collapsed borehole enlarging. As the result, high quality undisturbed cores have been obtained and rich drilling experiences in earthquake fault have been accumulated.

    参考文献
    相似文献
    引证文献
引用本文

赵远刚,樊腊生,杨明奇.汶川地震断裂带科学钻探项目WFSD-3-P孔钻探施工概况[J].钻探工程,2012,39(9):18-21.
ZHAO Yuan-gang, FAN La-sheng, YANG Ming-qi. Situation of WFSD-3-P Drilling Operation of Wenchuan Earthquake Fault Scientific Drilling Project[J]. Drilling Engineering, 2012,39(9):18-21.

复制
分享
文章指标
  • 点击次数:
  • 下载次数:
  • HTML阅读次数:
  • 引用次数:
历史
  • 收稿日期:2012-08-08
  • 最后修改日期:2012-08-08
  • 录用日期:2012-08-26
  • 在线发布日期: 2012-09-26
  • 出版日期: