汶川地震断裂带科学钻探项目WFSD-3孔施工技术与体会
DOI:
作者:
作者单位:

作者简介:

通讯作者:

中图分类号:

P634

基金项目:

科技部科技支撑计划专项“汶川地震断裂带科学钻探(WFSD)”项目之“科学钻探与科学测井”课题


Construction Technology and Experience of WFSD-3 Hole of Wenchuan Earthquake Fault Scientific Drilling Project
Author:
Affiliation:

Fund Project:

  • 摘要
  • |
  • 图/表
  • |
  • 访问统计
  • |
  • 参考文献
  • |
  • 相似文献
  • |
  • 引证文献
  • |
  • 资源附件
  • |
  • 文章评论
    摘要:

    WFSD-3孔是汶川地震科学钻探项目的系列钻孔之一,历经2年多的施工,攻克了世界罕见的复杂地层钻进、大直径原状样取心和高地应力下钻孔护壁重重技术难关,圆满完成了施工任务。重点介绍了WFSD-3孔施工技术与经验,并对施工若干技术问题提出探讨与认识。

    Abstract:

    The WFSD-3 hole is one of the series of boreholes of Wenchuan earthquake fault scientific drilling project. During 2 years’ construction, many technical challenges, such as drilling in complex strata, large diameter undisturbed core sampling and borehole wall protecting under high geo-stress were overcome. This article especially focused on the construction technology and experience of the WFSD-3 hole and discussed some technical problems.

    参考文献
    相似文献
    引证文献
引用本文

朱恒银,朱永宜,张文生,等.汶川地震断裂带科学钻探项目WFSD-3孔施工技术与体会[J].钻探工程,2012,39(9):12-17.
ZHU Heng-yin, ZHU Yong-yi, ZHANG Wen-sheng, et al. Construction Technology and Experience of WFSD-3 Hole of Wenchuan Earthquake Fault Scientific Drilling Project[J]. Drilling Engineering, 2012,39(9):12-17.

复制
分享
文章指标
  • 点击次数:
  • 下载次数:
  • HTML阅读次数:
  • 引用次数:
历史
  • 收稿日期:2012-08-08
  • 最后修改日期:2012-08-08
  • 录用日期:2012-08-26
  • 在线发布日期: 2012-09-26
  • 出版日期: