贵州省页岩气调查井施工工艺
DOI:
作者:
作者单位:

贵州省地矿局115地质大队,贵州省地矿局115地质大队

作者简介:

通讯作者:

中图分类号:

基金项目:


Summary of Shale Gas Investigation Well Construction Technology in Guizhou Province
Author:
Affiliation:

115 Geological Team, Bureau of Geology and Mineral Exploration and Development of Guizhou Province,115 Geological Team, Bureau of Geology and Mineral Exploration and Development of Guizhou Province

Fund Project:

  • 摘要
  • |
  • 图/表
  • |
  • 访问统计
  • |
  • 参考文献
  • |
  • 相似文献
  • |
  • 引证文献
  • |
  • 资源附件
  • |
  • 文章评论
    摘要:

    以“贵州省页岩气资源调查评价”项目部分调查井施工过程为依托,简要介绍了目前贵州省页岩气钻井工程和测井技术基本工艺情况,总结页岩气钻井和测井工作中存在的问题,可为同类工程提供借鉴。

    Abstract:

    Based on the part of investigation well construction process of “shale gas resource research and appraisal in Guizhou Province” project, this paper briefly introduced the basic information of shale gas drilling engineering and well logging technology and summarized the problems in shale gas drilling and logging, which could provide reference for the similar projects.

    参考文献
    相似文献
    引证文献
引用本文

宋继伟,李勇.贵州省页岩气调查井施工工艺[J].钻探工程,2013,40(8):26-30.
SONG Ji-wei, LI Yong. Summary of Shale Gas Investigation Well Construction Technology in Guizhou Province[J]. Drilling Engineering, 2013,40(8):26-30.

复制
分享
文章指标
  • 点击次数:
  • 下载次数:
  • HTML阅读次数:
  • 引用次数:
历史
  • 收稿日期:2013-04-26
  • 最后修改日期:2013-04-26
  • 录用日期:2013-05-31
  • 在线发布日期: 2013-09-03
  • 出版日期: