中交第二航务工程局第一分公司,中国地质大学〈北京〉工程技术学院,中国地震局地壳应力研究所〈地壳动力学实验室〉,河北省地震局
U655.55
The Second Harbor Engineering Company,School of Engineering and Technology, China University of Geosciences,Key laboratory of Crustal Dynamics, Institute of Crustal Dynamics, China Earthquake Administration,Hebei Euthquake Administradion
李可,李开洋,陈永前,等.利比里亚某港口码头钻孔灌注桩设计及其施工技术[J].钻探工程,2014,41(4):67-70.LI Ke, LI Kai-yang, CHEN Yong-qian, et al. Design and Construction Technology of Bored Pile in a Wharf in Republic of Liberia[J]. Drilling Engineering, 2014,41(4):67-70.
复制