3500 m钻机移摆管设计及动力学仿真研究
DOI:
作者:
作者单位:

中国地质科学院勘探技术研究所,中国地质科学院勘探技术研究所,中国地质科学院勘探技术研究所,中国地质科学院勘探技术研究所,中国地质科学院勘探技术研究所,中国地质科学院勘探技术研究所

作者简介:

通讯作者:

中图分类号:

基金项目:

中国地质调查局地质大调查项目“3500米深部地质勘查全液压钻探装备配套示范”(12120113016500)


Design of Pipe Racking for 3500m Hydraulic Core Drill Rig and the Dynamic Simulation Analysis
Author:
Affiliation:

The Institute of Exploration Techniques, CAGS,The Institute of Exploration Techniques, CAGS,The Institute of Exploration Techniques, CAGS,The Institute of Exploration Techniques, CAGS,The Institute of Exploration Techniques, CAGS,The Institute of Exploration Techniques, CAGS

Fund Project:

随着我国探矿深度不断增加,钻探设备的尺寸不断加大,操作人员的劳动强度也在增加。基于此,3500 m液压岩心钻机需要适配一套移摆管装置,以实现快速、安全地运移钻杆,降低工人的劳动强度。对移摆管机构的设计进行了简单介绍,并利用ADAMS动力学仿真软件对移摆管机构进行运动仿真,找出设计的不足之处,给出优化建议。

  • 摘要
  • |
  • 图/表
  • |
  • 访问统计
  • |
  • 参考文献
  • |
  • 相似文献
  • |
  • 引证文献
  • |
  • 资源附件
  • |
  • 文章评论
    摘要:

    随着我国探矿深度不断增加,钻探设备的尺寸也在不断加大,操作人员的劳动强度也在增加。基于此情况,3500液压岩心钻机需要适配一套的移摆管装置,在降低工人劳动强度的同时,也可以快速、安全的运移钻杆。本文设计了此移摆管机构,确定各运动部件参数以及型号,保障移摆管机构运动平稳、工作安全可靠。并利用ADAMS动力学仿真软件,对移摆管机构进行运动仿真,找出设计的不足之处,给出优化建议。

    Abstract:

    With the increasing depth of exploration,the size of drilling equipment becomes larger and larger, and the labor intensity of operators also increases. Based on this case, the 3500 hydraulic drilling rig requires a shift pendulum tube device to reduce labor intensity as well as to transport drill fast and safely. In this paper, the racking pipe device has been designed with a determination of the parameters and the mode of the moving parts to guarantee the racking pipe device move smoothly and operate safely and reliably. Meanwhile, ADAMS dynamics simulation software has been used to conduct motion simulation for the device to identify deficiencies in the design, and to give optimization recommendations.

    参考文献
    相似文献
    引证文献
引用本文

陈根龙,张金昌,刘凡柏,等.3500 m钻机移摆管设计及动力学仿真研究[J].钻探工程,2014,41(4):56-60.
CHEN Gen-long, ZHANG Jin-chang, LIU Fan-bai, et al. Design of Pipe Racking for 3500m Hydraulic Core Drill Rig and the Dynamic Simulation Analysis[J]. Drilling Engineering, 2014,41(4):56-60.

复制
分享
文章指标
  • 点击次数:
  • 下载次数:
  • HTML阅读次数:
  • 引用次数:
历史
  • 收稿日期:2014-03-28
  • 最后修改日期:2014-03-28
  • 录用日期:2014-04-08
  • 在线发布日期: 2014-04-28
  • 出版日期: