车载修井机井架静强度有限元分析
CSTR:
作者:
作者单位:

中煤科工集团西安研究院有限公司


Finite Element Analysis on Static Strength of Truck-mounted Workover Rig Derrick
Author:
Affiliation:

Xi’an Research Institute of China Coal Technology & Engineering Group Corp

  • 摘要
  • | |
  • 访问统计
  • |
  • 参考文献 [5]
  • |
  • 相似文献 [20]
  • |
  • 引证文献
  • | |
  • 文章评论
    摘要:

    车载修井机井架静强度分析中,通常略去绷绳和风载的影响,这与井架的实际工况不符。以ABAQUS软件为工具,对某车载修井机井架进行了有限元分析。在不同的静钩载及风载作用下,得出了井架所能承受的最大静钩载以及确定了井架薄弱点所处的位置。并通过计算合理地缩短了绷绳的斜拉范围。

    Abstract:

    Conventionally, the influence of guy wire and wind load on derrick was often ignored in the static strength analysis on derrick of truck-mounted workover rig, but it does not accord with the actual working conditions. This paper made the finite element analysis on a derrick of truck-mounted workover rig through ABAQUS software. Under different static hock loads and wind loads, the maximum static hock load the derrick can bear was obtained and the weak point position on derrick was determined. Based on the calculation, the cable-stayed range of guy wire was reasonably shortened.

    参考文献
    1.金嘉琦,朱思颢.车载式不压井修井机井架应力及动力特性分析[J]. 石油矿场机械,2012,41(4):81-84.
    2.罗春雨,董菲. 基于 ANSYS 的ZT160 型修井机底座结构的设计优化[J]. 齐齐哈尔大学学报,2013,29(5):76-79.
    3.陈如恒,沈家骏.钻井机械的设计计算[M].北京:石油工业出版社,1995.
    4.杨龙飞,王龙庭,徐兴平,等.油田车载修井井架力学分析与结构优化设计[J].机械工程与自动化,2013,6:70-72.
    5.韩东颖,吴畏。井架钢结构在风载工况下的安全性分析[J]。广西大学学报,2013,38(6):1290-1299.
    网友评论
    网友评论
    分享到微博
    发 布
引用本文

刘智.车载修井机井架静强度有限元分析[J].钻探工程,2014,41(10):72-74.
〗LIU Zhi. Finite Element Analysis on Static Strength of Truck-mounted Workover Rig Derrick[J]. Drilling Engineering, 2014,41(10):72-74.

复制
分享
文章指标
  • 点击次数:854
  • 下载次数: 870
  • HTML阅读次数: 207
  • 引用次数: 0
历史
  • 收稿日期:2014-06-01
  • 最后修改日期:2014-07-02
  • 录用日期:2014-08-05
  • 在线发布日期: 2014-11-13
文章二维码