高速铁路浅埋大跨度隧道下穿公路施工安全性分析
DOI:
作者:
作者单位:

深圳市地铁集团有限公司

作者简介:

通讯作者:

中图分类号:

U455.4

基金项目:


Analysis on Construction Safety of Shallow Large-span Tunnel Passing through the Road for High-speed Railway
Author:
Affiliation:

Shenzhen Metro Group Co., Ltd.

Fund Project:

  • 摘要
  • |
  • 图/表
  • |
  • 访问统计
  • |
  • 参考文献
  • |
  • 相似文献
  • |
  • 引证文献
  • |
  • 资源附件
  • |
  • 文章评论
    摘要:

    成都至贵阳客运专线南厂沟浅埋大跨度隧道下穿公路,重载车辆繁多,对隧道施工安全及道路行车安全造成威胁。采用FLAC3D软件分别对无行车条件下和行车荷载作用下施工过程进行了数值模拟,对比分析了两种工况下的受力及变形,结果表明,行车荷载对该隧道施工影响较小。下穿施工过程及监测数据分析表明,南厂沟隧道下穿公路数值模拟是合理的,为顺利施工提供了有益指导。

    Abstract:

    In the construction of Nanchanggou shallow large-span tunnel which passed through the road for the passenger dedicated line of Chengdu to Guiyang, various heavy vehicles posed threat to the tunnel construction and road traffic safety. FLAC3D was used for numerical stimulation of construction progress under the conditions of no traffic and with traffic load respectively to analyze the stress and deformation under the different working conditions. The results showed that the traffic load had little effect on the tunnel construction. The analysis on the tunnel passing process and the monitoring data show that the numerical stimulation of under-passing Nanchanggou tunnel is reasonable, which provides useful guidance for construction.

    参考文献
    相似文献
    引证文献
引用本文

潘晓明.高速铁路浅埋大跨度隧道下穿公路施工安全性分析[J].钻探工程,2015,42(9):72-75.
PAN Xiao-ming. Analysis on Construction Safety of Shallow Large-span Tunnel Passing through the Road for High-speed Railway[J]. Drilling Engineering, 2015,42(9):72-75.

复制
分享
文章指标
  • 点击次数:
  • 下载次数:
  • HTML阅读次数:
  • 引用次数:
历史
  • 收稿日期:2015-04-11
  • 最后修改日期:2015-04-11
  • 录用日期:2015-07-10
  • 在线发布日期: 2015-10-08
  • 出版日期: